Loading Content... One Moment Please
Offcanvas
Some text as placeholder. In real life you can have the elements you have chosen. Like, text, images, lists, etc.

Angelica Pavoni Project Portfolio

Row ID: 4 TOTAL: 6 Remainder: 2
Row ID: 8 TOTAL: 6 Remainder: 2

West Valley City Police Department

West Valley City

  • Catalog No.
    3338
  • Client
    West Valley City
  • Area
    61,232 SF
  • Completion
    2019

Conforming to the constraints of a compact urban site with consideration to its adjacency to a large multi-modal transit hub, our design team developed a modern, ‘right-sized’ design solution to consolidate uses previously housed in multiple other locations. The Police Department expresses transparency and accountability within the community it serves, while ensuring a safe place, for those working and visiting the facility.

Our application of trauma-informed, biophilic design principles includes semi-private quiet spaces for staff on each floor to decompress, have quiet conversations and receive counseling after high-stress events. “Soft” interview rooms give victims a safe, comfortable space to recount events and make statements. Careful consideration of the second and third floor workspace placement and windows maximize natural light penetration while connecting users with place and nature through views of the Wasatch Front and Oquirrh mountains.

Fairbourne Station Office Tower

West Valley City

  • Catalog No.
    3339
  • Client
    Wasatch Properties
  • Area
    243,460 SF
  • Completion
    2020

Positioned in the heart of West Valley City’s new urban core, the Fairbourne Station Office Tower is designed to attract local and national businesses due to its customizable tenant spaces and proximity to the airport, highways and mass transit. The tower’s skyline-defining solar array serves as both a striking design feature and functional power source, with 698 panels capable of providing an estimated annual production of 330,000 kWh.

A sleek facade of brick, metal panels and glass curtain walls enhance the building’s modern aesthetic, while the cherry wood veneer lobby, polished concrete floors and etched glass panels add to its refined interior. As a central hub of West Valley City's Redevelopment Plan, the tower sets architectural standards for future developments.

Science and Industry Chemistry Lab Remodel

Taylorsville

  • Catalog No.
    2676
  • Client
    Salt Lake Community College
  • Area
    28,500 SF
  • Completion
    2021

From pre-planning and programming to design and construction phases, our Science Team orchestrated a comprehensive transformation of the existing third-floor teaching labs support a range of academic needs. Our solution focused on developing learning environments conducive to the instruction of smaller class sizes (around 25 students). The revamped space provides efficient lab support for wet lab research activities, with dedicated areas for preparation and storage. The introduction of Lab Coordinator work areas enhanced overall operational efficiency. In response to the evolving landscape of educational technology, the Audio/Visual infrastructure supports both in-place and long-distance instruction, aligning with the growing demands for flexible and technologically advanced learning environments.

Applied Sciences Building

Salt Lake City

  • Catalog No.
    3120
  • Client
    University of Utah
  • Area
    140,000 SF
  • Completion
    2024

The Applied Science Building is set to become a cornerstone in the University of Utah’s educational and research mission. The building features state-of-the-art amenities, including modern classrooms, experimental laboratories and cutting-edge computer facilities. A dedicated student research support center fosters an environment conducive to active engagement in research and honors projects, streamlining project and degree completion. With a focus on accommodating the instructional needs of over 5,600 undergraduate and graduate students in STEM courses, the facility combines a thoughtful 40,000+ SF renovation of the historic Stewart Building with a contemporary 100,000+ SF addition. The Applied Science Building is not just a physical structure; it embodies a commitment to excellence, innovation and a bright future for the University of Utah’s academic and research pursuits.

Henry Eyring Building Chemistry Building Renovation

Salt Lake City

  • Catalog No.
    2827
  • Client
    University of Utah
  • Area
    92,000 SF
  • Completion
    Ongoing

The extensive 92,000-square-foot North Tower of the Henry Eyring Chemistry Building (HEB) renovation is unfolding in a carefully planned sequence of nine phases. Transforming HEB into a cutting-edge facility for teaching and chemistry research lab began with our leading a comprehensive facility master plan that meticulously assessed the capacities of the existing architectural, structural, mechanical and electrical infrastructure, The master plan documented the existing conditions and capacities while outlining recommended time frames through a proposed sequencing of design and construction phases and a map detailing the relocation of existing occupants to facilitate the execution of each phase. Our phased design and construction approach ensures that the facility can continue to operate smoothly during the renovation process with minimal disruptions to ongoing activities and services.

Fairbourne Station Mixed Use Master Plan

West Valley City

  • Catalog No.
    2435
  • Client
    West Valley City, Wasatch Commercial Management
  • Area
    15 ac
  • Completion
    2020

We led a group of stakeholders to develop a cohesive urban design vision and development strategy to master plan Fairbourne Station, West Valley City's evolving mixed-use downtown district. Located on a compact 15 ace urban site with adjacencies to City Hall and West Valley Central Station TRAX stop the focus included developing a services and amenity rich walkable District. The overall vision clusters high density residential, hospitality, retail, several civic and municipal services, clinical and medical offices and class A commercial office space around community green space.

As part of the over $80 M buildout of the master plan's phase 1, we worked with the City and developer to design and construct the Police Department, Fairbourne Station Office Tower and the District's parking garage.